Naval Architectural Services

 

Project Type

Project Details

Year

Sea keeping and hydrodynamic analysis

  • Calculation of extreme sea motions at cranes and vessel CG points under sea conditions given by the owners

2011 - Singapore

Stability calculations -  chemical tanker post conversion

  • Preparation of hydrostatic model
  • Intact and damage stability calculations
  • Submission for Class

2011-ongoing

Modifications to vessel bunker tanks

  • Conversion of existing fuel oil tank to two diesel oil tanks

2010-ongoing

Modification of bilge holding tank to sewage holding tank

  • Structural Calculations
  • Strength analysis
  • Preparation of new structural drawings
  • Preparation of piping schematics
  • Preparation of interface drawings

2010

Stability Booklet Preparation for FPSO

  • Preparation of intact and damage Stability calculations under various conditions

2010

Vessel Steel Replacement Analysis

  • Calculation of quantum of steel to be replace
  • Analysis of vessel’s sag

2010

Material Handling System upgrade -  Phase 3 (69,000 tdw transshipment vessel)

  • Prepare procedures for de-commissioning of existing crane and installation of new crane
  • Prepare design calculations and stowage plans for crane jibs
  • Co-ordination of work to be carried out by crane suppliers, shipyard and class
  • Supervision for installation of cranes in shipyard
  • Assistance in hooking up  crane system

2010

Specification review – IMT 993 ROVCD support vessel

  • Complete review of the contracted technical specification for compliance
  • Comparison and review of equipment under supply

2010

Preparation of Ships Manuals

  • BWMP, SOPEP & SMPEP

2009 – India

Vessel Conversion – Fishing Trawler to Oceanographic Research

  • Conversion, Design and Engineering 
  • Machinery and Electrical layouts
  • Machinery system schematics
  • Regulatory compliance checks
  • Deck strengthening calculations
  • Foundation drawings
  • Electrical schematics

2009

GRT/NRT

  • Tonnage computation for tugs.

2008 – India

Specification Review for 150Ton bollard pole anchor handler

  • Complete review of the contracted technical specification for compliance
  • Comparison and review of equipment under supply
2006

Specification review

– UT 775LM platform supply vessel
  • Complete review of the contracted technical specification for compliance
  • Comparison and review of equipment under supply
2006

Specification review

– 120 T BP AHTSV
  2006

Specification Review

– 3000 TWD super coaster
  • Complete review of the contracted technical specification for compliance
  • Comparison and review of equipment under supply
2005

New building vessel specification Review – 1100 TEU container vessel

  • Complete review of the contracted technical specification for compliance
  • Comparison and review of equipment under supply

2004