Project Type |
Project Details |
Year |
Sea keeping and hydrodynamic analysis |
- Calculation of extreme sea motions at cranes and vessel CG points under sea conditions given by the owners
|
2011 - Singapore |
Stability calculations - chemical tanker post conversion |
- Preparation of hydrostatic model
- Intact and damage stability calculations
- Submission for Class
|
2011-ongoing |
Modifications to vessel bunker tanks |
- Conversion of existing fuel oil tank to two diesel oil tanks
|
2010-ongoing |
Modification of bilge holding tank to sewage holding tank |
- Structural Calculations
- Strength analysis
- Preparation of new structural drawings
- Preparation of piping schematics
- Preparation of interface drawings
|
2010 |
Stability Booklet Preparation for FPSO |
- Preparation of intact and damage Stability calculations under various conditions
|
2010 |
Vessel Steel Replacement Analysis |
- Calculation of quantum of steel to be replace
- Analysis of vessel’s sag
|
2010 |
Material Handling System upgrade - Phase 3 (69,000 tdw transshipment vessel) |
- Prepare procedures for de-commissioning of existing crane and installation of new crane
- Prepare design calculations and stowage plans for crane jibs
- Co-ordination of work to be carried out by crane suppliers, shipyard and class
- Supervision for installation of cranes in shipyard
- Assistance in hooking up crane system
|
2010
|
Specification review – IMT 993 ROVCD support vessel |
- Complete review of the contracted technical specification for compliance
- Comparison and review of equipment under supply
|
2010 |
Preparation of Ships Manuals |
|
2009 – India |
Vessel Conversion – Fishing Trawler to Oceanographic Research |
- Conversion, Design and Engineering
- Machinery and Electrical layouts
- Machinery system schematics
- Regulatory compliance checks
- Deck strengthening calculations
- Foundation drawings
- Electrical schematics
|
2009 |
GRT/NRT |
- Tonnage computation for tugs.
|
2008 – India |
Specification Review for 150Ton bollard pole anchor handler |
- Complete review of the contracted technical specification for compliance
- Comparison and review of equipment under supply
|
2006 |
Specification review
– UT 775LM platform supply vessel |
- Complete review of the contracted technical specification for compliance
- Comparison and review of equipment under supply
|
2006 |
Specification review
– 120 T BP AHTSV |
|
2006 |
Specification Review
– 3000 TWD super coaster |
- Complete review of the contracted technical specification for compliance
- Comparison and review of equipment under supply
|
2005 |
New building vessel specification Review – 1100 TEU container vessel |
- Complete review of the contracted technical specification for compliance
- Comparison and review of equipment under supply
|
2004 |