You are here : Home    project    Design and Engineering

Design and Engineering

 

Year / Location

Project Type

Project Details

2013-India

INS Sujata

  • Inclining experiment and stability calculations

2013-India

Plan Approval for Bulk Carrier
(28029 MT)

  • Modification & Preparation of  FCP and LSA Plans

2013-India

50 m Twin Hull
Battle Practise target

  • Hull form and calculations
  • Basic Design

2013-India

2200 TEU Container Ship

  • Converting Void tank to Sewage Retention tank

2013-India

Vestfonn – Well Stimulation Vessel

  • Installation of separator
  • Layout of Aft deck area
  • Deck Strength calculations
  • Blast calculations

2013-Rwanda

Detailed design of

  • Aluminum ferry
  • Self propelled barge
  • Flat top dumb barge
  • Pusher tugs
  • Conceptional design
  • Basic design
  • Detailed design
  • Preparation of tender docs for the designed vessels

2012-Australia

Calculation of stability of AHTS for safe carriage of cargo

  • Calculation of stability parameters (Equipment weights & distribution, GM and GZ curve)
  • Recommendations on maximum cargo carriage and distribution

2012-India

Modification of PSV “Ramya & Yamuna” for carriage of Well Stim System

  • Sea fastening calculations
  • Revised stability calculations
  • Skid securing design

2012-India

Loading of Heavy Lift Cargo on to a barge

  • Sea fastening calculations
  • Preparation of stowage and lashing plan

2012-India

INS Sujata – Inclining Experiment

  • Performing inclining experiment.
  • Preparation of report for inclining experiment.
  • Monitoring and in charge of inclining experiment of Indian Navy’s Cadet training ship INS Sujata

2012-India

WISL / Indian Navy Fuel Barges

  • Concept, design & preparation of design philosophy document for Fuel Barges

2012-India

BWMP for vessel Stanford Hobby

  • Preparation of Ballast Water Management Plan.

2012-Singapore

Concept GA preparation for Geotechnical Research vessel

  • Preparation of Concept General Arrangement of Geotechnical Research Vessel (LOA- 55.20 m,Breadth -13.50 m,Depth- 6.25m )
  • Equipment Number Calculations for the determination of mooring equipments for the Geotechnical Research Vessel
  • Preparation of Concept General Arrangement of Supply Vessel (LOA- 94.65 m, Breadth- 22.00 m, Depth- 9.20m)

2012-India

WSV Vestfonn – Emergency Towing booklet

  • Preparation of Emergency Towing Booklet

2011-India

Cargo Loading on barge

  • Sea fastening calculations
  • Preparation of stowage and lashing plan

2011- Singapore

Mooring Force Calculations

  • Mooring Force Calculations for LNG Vessel berthing at LNG Terminal

2011- Singapore

Finite Element Analysis and modification to pontoon crane 30T SWL Pedestal for Veer Avaneesh

  • Finite Element Analysis of Crane Pedestal
  • Identification of high stress areas & mitigation of stresses
  • Modification to Pedestal Design

2011-India

Design of steel luxury yacht

  • Conceptual design
  • Design computations
  • Basic design
  • Detail Design

2011-Singapore / India

Plan Approval for Bulk Carrier

  • Plan approval for Hull, Machinery, piping and Electrical drawings.

2011-India

Preparation of LSA, LSS & FCP Drawings & acc plans for 2 vessels

  • Preparation of LSA, LSS & FCP Drawings & acc plans for 2 vessels

2011-India

Stability calculations -  chemical tanker post conversion

  • Preparation of hydrostatic model
  • Intact and damage stability calculations
  • Submission for Class

2011-India

Emergency Towing Booklet

  • Preparation of Emergency Towing Booklet

2011-India

Damage Control Booklet & Damage Control Plan

  • Preparation of Damage Control Booklet & Damage Control Plan

2011-India

STP foundation & grey water system drawing for Naval vessel.

  • Design and preparation of drawing for STP Plant.
  • Complete design of Grey water system.

2011-India

Gob eye Design & Deck strengthening  (45 T)

  • Design and preparation of drawing for 45 T Gob eye and under deck stiffening.

2011-Singapore

Plan approval for 32K Dwt  bulk carrier at China

  • Plan approval for Hull, Machinery, piping and Electrical drawings.

2011-Singapore

Plan approval for 82K Dwt Kamsarmax bulk carrier

  • Plan approval for Hull, Machinery, piping and Electrical drawings.

2011-India

WISL / Indian Navy Battle practice target

  • Concept design & preparation design philosophy Document for a Catamaran Battle practice target.

2010-2011 – India

Preparation of Plans

  • Preparation of LSA, LSS & FCP Plans, Accommodation plans & Stability Booklet for 10 Dredger vessels

2010-India

Modifications to vessel bunker tanks

  • Conversion of existing fuel oil tank to two diesel oil tanks

2010-India

Technical Contract for 4 Capesize Bulk Carriers

  • Technical specification review of four [Chinese/Korean] shipyards;
  • Equipment makers list review for the same shipyards.
  • Technical negotiations in India/Abroad with the same shipyards.
  • Provide RNRL a consolidated comparison-sheet of the specifications provided by the four shipyards 

2010-Singapore / India

Plan Approval for PSV

  • Plan approval for Hull, Machinery, Piping and Electrical drawings.

2010-India

WISL/Indian Navy Berthing Pontoons

  • Concept design & preparation Design Philosophy Document for a catamaran pontoon.

2010-India

Vessel Steel Replacement Analysis

  • Calculation of quantum of steel to be replace
  • Analysis of vessel’s sag

2010-India

Material Handling System upgrade -  Phase 3 (69,000 tdw transshipment vessel)

  • Prepare procedures for de-commissioning of existing crane and installation of new crane
  • Prepare design calculations and stowage plans for crane jibs
  • Co-ordination of work to be carried out by crane suppliers, shipyard and class
  • Supervision for installation of cranes in shipyard
  • Assistance in hooking up  crane system

2009-India

Vessel Conversion – Fishing vessel to Oceanographic Research vessel.

  • Conversion, Design and Engineering 
  • Machinery and Electrical layouts
  • Machinery system schematics
  • Regulatory compliance checks
  • Deck strengthening calculations
  • Foundation drawings
  • Electrical schematics

2009-India

Preparation of Ships Manuals

  • BWMP, SOPEP & SMPEP

2008-India

GRT/NRT

  • Tonnage computation for 3 tugs.

2007-Singapore

Submersible Barge Launch

Jacket Barge

  • Barge lengthening structural drawings
  • Rocker arm drawings and calculation
  • Stability calculation / Longitudinal strength calculation
  • FEM analysis for barge structure

Submersible Barge

  • Design of tanks on upper deck
  • Stability calculation for submerging operation
  • Repositioning of Generator room
  • Repositioning of Pump room.

2007-Singapore

Container carrier to General Cargo vessel

  • Equipment specifications
  • Basic design including lines generation
  • Cargo hold strength analysis
  • Section modulus calculations

2006-India

Material Handling System upgrade -  Phase 3 (69,000 tdw transshipment vessel)

  • Prepare procedures for de-commissioning of existing crane and installation of new crane
  • Prepare design calculations and stowage plans for crane jibs
  • Co-ordination of work to be carried out by crane suppliers, shipyard and class
  • Supervision for installation of cranes in shipyard
  • Assistance in hooking up  crane system

2006-Singapore

Upgrade design for VLCC

  • Design and drawing of piping modification

2005-Singapore

Design evaluation (2 x 1,030 TEU Container Vessels)

  • Technical Specifications Review
  • Contract Review
  • Drawings Appraisal and Design Review

2005-India

Detailed condition assessment and life extension study for 7,412 tdw multipurpose container vessel

  • Detailed condition assessment, fatigue analysis
  • Hull
  • Cargo Handling systems
  • Propulsion
  • Life extension evaluation for 5 years
  • Costs and proposals for upgrade / maintainability and /or replacement

2004-2005-India

Detailed condition assessment and life extension study for 69,000 tdw transshipment vessel

  • Detailed condition assessment, vibration analysis, fatigue analysis
  • Hull
  • Material Handling systems
  • Propulsion Life extension evaluation for 15 years
  • Costs and proposals for upgrade / maintainability and /or replacement.

2004-2005 China

Vessel conversion and service engineering (145,000 tdw bulker to transshipment vessel)

  • Design and Engineering for Material and ship systems.
  • Service engineering after deployment