Year
/ Location |
Client |
Project
Type |
Project
Detail |
2006 – Goa, India
69,000 tdw Transshipment Vessel |
Sesa Goa Ltd |
Material handling system
upgrade – Phase 3 |
• Prepare procedures
for de- commissioning of existing
crane and installation of new crane
• Prepare design calculations and stowage
plans for crane jibs •
Co-ordination of work to be carried out by
crane suppliers, shipyard and class |
2006 –
Singapore
1 x FPSO 59,650 DWT
|
Undisclosed |
Upgrade design and systems
engineering |
• Location analysis
/ spread mooring analysis
• Offloading analysis
• Hull analysis
• Evaluation of marine systems |
2006 – Singapore
VLCC
|
NYK |
Upgrade design |
• Design and drawing
of piping modification |
| 2006 - Singapore / Malaysia
|
Undisclosed |
Conversion of 1 x chemical
tanker to FPSO |
• Complete preliminary
design and engineering for bid process
• Hull evaluation for ultimate limit states |
2006 - Ongoing Cochin Shipyard
India
(8 x PSV UT 755 LN)
|
Hellespont Steamship Ltd |
New Building Project management |
• Technical Specifications
Review • Contract Review •
Drawings appraisal and Design review •
New Building site supervision • Trials
and commissioning |
2006 –
India – Ongoing
(2x Diving Support Vessel)
|
Vroon Group B.V. |
New Building Project management |
• Technical Specifications
Review • Contract Review •
Drawings appraisal and Design review •
New Building site supervision • Trials
and commissioning |
2006- India – Ongoing
4 x 12,800 DWT IMO II Chemical Tankers
|
Seatankers AS |
New Building Project management |
• Technical Specifications
Review • Contract Review •
Drawings appraisal and Design review •
New Building site supervision • Trials
and commissioning |
| 2006 - Singapore |
Nordic Maritime (S) Pte
Ltd. |
Upgrade design and systems
engineering |
• Feasibility study
of new Pumproom with stability calculations
• Structural modifications design including
steel plating • Piping
and electrical plans • Digitization
of plans
|
| 2006-Singapore / Malaysia |
Undisclosed |
Conversion of 2 Panamax
hulls to FPSOs |
• Complete preliminary
design and engineering for bid process
• Hull evaluation for ultimate limit states
• Systems engineering and integration
of process plant and topsides
• Preparation of tender documents for
submission
|
2006 – Singapore shipyard
1 x FPSO 59,650 DWT |
Undisclosed |
Steel renewal |
• Shipyard supervision
of steel renewals |
| 2006-Singapore / Malaysia |
Undisclosed |
Conversion of Suezmax tanker
to FPSO |
• Complete preliminary
design and engineering for bid process
• Hull evaluation for ultimate limit states
• Systems engineering and integration
of process plant and topsides
• Preparation of tender documents for
submission to oil major
|
| 2005 – Cochin shipyard |
S&P consultants |
Shipyard evaluation |
• Design and construction
technology evaluation •
Capability and past experience • Production
facilities • Financial position
|
| 2005-Singapore |
Nordic Maritime (S) Pte
Ltd. |
Conversion of Hydrographic
vessel to Seismic vessel |
• Complete design
of Seismic systems
• Complete revision of all statutory drawings
• Class approvals of all design drawings
|
| 2005- Mumbai, India |
Reliance Industries Ltd. |
Marine Logistics and ports
development |
• Total Marine logistics
study.
• Preliminary design of jetties
• Development of marine transportation
solution for transport of passengers
and materials
|
| 2005 – Alcock ashdown
shipyard |
Frontline Ltd. |
Shipyard evaluation |
• Design and construction
technology evaluation
• Capability and past experience
• Production facilities
• Financial position
|
2005
Fleet of Coastal Service Container Vessels
|
Shreyas Shipping Ltd |
Detailed Fleet Condition
assessment and Audits |
• Assessment of all
vessels in fleet
• Preparation of detailed technical management
corrective actions
• Preparation of ongoing audit system
for monitoring performance and vessel
condition
|
2005 - Goa, India
69,000 tdw Transshipment vessel
|
Sesa Goa Ltd |
Feasibility and Detailed
Project Report for conversion |
• Detailed study /
design for conversion of existing
transshipment vessel with new Material
handling system
• Installation of new machinery including
Generators, Conveyor systems, gantries
and cranes.
|
2005 Mumbai, India
7,412 tdw Multipurpose Container vessel
|
Shreyas Shipping Ltd. |
Detailed Condition Assessment
and Life Extension Study |
• Detailed condition
assessment, fatigue analysis
- Hull
- Cargo Handling systems
- Propulsion
• Life extension evaluation for 5 years
• Costs and proposals for upgrade / maintainability
and /or replacement.
|
2005-Ongoing Jaya Shipyard
Singapore (2 x 75m - Anchor Handling Tugs/ Supply
Vessels)
|
DESS ASA |
New Building
Project Management
|
• Shipyard Evaluation
• Technical Specifications Review
• Contract Review
• Drawings appraisal and Design review
• New Building site supervision
• Trials and commissioning
|
2005-Ongoing ABG Shipyard
India
(6 x 63m - Anchor Handling Tugs/
Supply Vessels)
|
DESS ASA |
New Building
Project Management
|
• Shipyard Evaluation
• Technical Specifications Review
• Contract Review
• Drawings appraisal and Design review
• New Building site supervision
• Trials and commissioning
|
2005-Ongoing Cochin Shipyard
India
(4 x 72m – Platform Support Vessels)
|
DESS ASA |
New Building
Project Management
|
• Shipyard Evaluation
• Technical Specifications Review
• Contract Review
• Drawings appraisal and Design review
• New Building site supervision
• Trials and commissioning
|
| 2005 – Bharati shipyard |
Thome Shipmanagement Pvt
Ltd. |
Shipyard evaluation |
• Design and construction
technology evaluation
• Capability and past experience
• Production facilities
• Financial position
|
2004-2005 Goa, India
69,000 tdw Transshipment vessel
|
Sesa Goa Ltd |
Detailed Condition Assessment
and Life Extension Study |
• Detailed condition
assessment, vibration analysis,
fatigue analysis
- Hull
- Material Handling systems
- Propulsion
• Life extension evaluation for 15 years
• Costs and proposals for upgrade / maintainability
and /or replacement.
|
2005 Shipyard-Singapore
2 x 1,030 TEU Container Vessels
|
Shreyas Shipping Ltd. |
Design Evaluation |
• Technical Specifications
Review
• Contract Review
• Drawings appraisal and Design review
|
2004-2005 Nantong, China
145,000 tdw Bulker to Transshipment vessel
|
SeaBulk Systems Inc.
Canada
|
Vessel Conversion
and Service engineering
|
• Design and Engineering
for Material and ship systems.
• Service engineering after deployment.
|
2004-2005 Client –
India
Automobile transportation
|
Shreyas Shipping Ltd |
Vessel Procurement Feasibility
and cost projections |
• Feasibility study
of a particular industrial sector
in India.
• Growth analysis, projections and sustainability.
• Cargo Volume projections
• Meetings with industry and validation
of data.
• Validation of ports – physical
and commercial.
• Costs for vessel induction, parking
yard set up and operation.
• Project operating cost predictions,
rate calculations and IRR.
|
| 2004 |
Avalon Consultants |
Industry Analysis for business
growth |
• Broad-based review
of Indian Industry for review of
business opportunities for Marine
Logistics. |